Tuesday 30th November 2021: River of Life Project (Phase 2) near Clifton Hampden

Leader: Tim Read (Senior Ranger, Earth Trust)

2111_Report/2111_RoL_1.jpgTim Read describing the River of Life Project to our group

The sun came out and the previous day’s sprinkling of snow had already melted by the time our group of 20 Abingdon Naturalists walked along the Thames Path to see the new backwater channels and ponds that had been created to the east of Clifton Hampden. The River of Life Project Phase 2 excavations had only just been completed a couple of months ago, and form a large upstream extension to Phase 1 of the Earth Trust’s ‘River of Life’ Project, which is located downstream near Shillingford.

Our excellent leader, Tim Read, explained that the aims of Earth Trust’s River of Life Project are to re-wild a section of the Thames riverbank by creating a series of backwater channels, open water and temporary ponds, fens, scrapes and wet woodland,, which will help increase biodiversity as well as slowing down and filtering water run-off from nearby arable fields as it reaches the river.

Tim showed us the GPS survey maps of height above sea level which had been used to identify low points in the banks of the Thames and in the adjacent floodplain meadows. These low points were where wetlands and palaeochannels had existed historically before the fields had been drained and the river banks raised. The new water features were designed to recreate these historic wetlands and backwaters. The GPS contour maps maps were converted into CAD designs which were transmitted by WIFI direct to the cabs of the excavating machines. This removed human error from the equation, so that the resulting excavations exactly matched the carefully prepared CAD designs.

During July to September 2021 the diggers had created 17 new ponds and 5 backwater channels and in the process had excavated approximately 38,000m3 of spoil. Environment Agency regulations prohibit the dumping of spoil in the flood plain, so caterpillar-tracked dumpers transported the spoil a few hundred metres inland, where it was spread onto adjacent arable fields belonging to the Earth Trust, raising the soil level in these fields by around 3 to 4 inches.

We heard the characteristic whistle of a kingfisher, and most of the group were able to see the flash of blue as it flew and then landed on a branch on the opposite bank. We also saw a handsome male stonechat perched on an electric fencing stake. Two Egyptian geese and a grey heron had already taken up residence in one of the new backwater channels.

It was very interesting to see the new channels and ponds so soon after they had been created. Already there were signs of reed and other plants starting to colonise the bare banks. We hope to return again in a year or two’s time, to see how this amazing project has progressed.

Attendees:
Cynth Napper, Jim Ballantyne (guest), Halcyon & James Leonard, Jonathan Noel, Michael Bloom, Beryl & Barry Stayte, Nigel & Caroline Gregory, Mike Turner, Alison & Sylfest Muldal, Sally Gillard, Tony & Lyn Richmond, Felicity Jenkins, Richard Lewington, Barbara Pope
2111_Report/2111_RoL_2.jpgThis new boardwalk across one of the backwater channels is made from recycled plastic and will last for hundreds of years
/2111_Report/2111_RoL_3.jpgA meandering backwater channel
111_Report/2111_RoL_4.jpgThe culverts connecting the new backwater channels to the River Thames all point downstream in order to reduce the risk of becoming blocked by debris